The environmental impact assessment of the 300,000-ton crude oil terminal project in Bohe New Port Area of Maoming Port has been published for the first time

2021-11-17

According to the Environmental Impact Assessment Law of the People's Republic of China and Measures for Public Participation in Environmental Impact Assessment (Decree No. 4 of the Ministry of Ecology and Environment),The environmental impact of the 300,000-ton crude oil terminal project in Bohe New Port area of Maoming Port will be publicized,If the public has any comments, they can contact the environmental impact assessment unit, the construction unit or the ecological environment department。


•1 Project overview


The 300,000-ton crude oil terminal project of Bohe New Port Area in Maoming Port is located in the planned 300,000-ton crude oil berth of the liquid bulk cargo operation area inside the east breakwater of Bohe New Port Area。The main construction contents of the project are: to build a 300,000-ton crude oil terminal and its supporting facilities。Among them, the pier is arranged in butterfly shape, with a total length of 404m. It is composed of 1 working platform, 2 docking piers and 6 mooring piers, with an annual designed passing capacity of 16.5 million tons。The dock is connected to the rear tank farm by pipeline。

The total investment of the project is 176,684.550,000 yuan, construction period of 20 months。


•2 Name and contact information of the construction unit


Construction unit: Maoming Petrochemical Bohe Port Terminal Co., LTD

Contact: Yue Xiaogong

Contact: 0668-3385680

Email Address:1262039708@qq.com

Address: Room 209, 2nd Floor, Bohe New Port Planning Exhibition Center, Lingjiao Village, Diancheng Town, Dianbai District, Maoming City


•3 Name of the organization that prepared the environmental impact statement


Evaluation unit: Beijing Zhongjiao 'an Environmental Detection Technology Research Institute Co., LTD

Contact person: Gao Fengxiang

Landline: 010-64218065

Contact phone: 18513059457

Email Address:1428155646@qq.com

Mailing address: Room 412, Anyuan Building, Qingniangou Road, Chaoyang District, Beijing。


•4 Web link to the public comment form


The main matters for the project to solicit public opinions are whether the project construction is reasonable and whether the environmental impact degree is acceptable, etc. The public opinions are listed in the attachment of the announcement。


•5 Ways and means to submit the public comment form


Within 10 working days from the date of this announcement, the public can download the public opinion form through the above network link, and submit the completed public opinion form to the construction unit of the proposed project by letter, fax, E-mail or other means, or communicate with each other by telephone。Members of the public who submit the submission form are requested to indicate the date of filling in the form, their real name and valid contact information, so that they can provide timely feedback to the public as needed。


附件1:Public Feedback Form


Maoming Petrochemical Bohe Port Terminal Co. LTD
September 22, 2021

>> 返 回 <<